Summary of target achievements

Summary of scoring criteria

The table below sets out the agreed criteria for scoring BAA London Stansted's progress against its targets for 2006/07.

Score Criteria
No progress The target actions have not been progressed at all, or performance is lower than last year.
Some progress made The target has not been achieved but actions have been carried out towards delivering the target. Performance has not achieved the target but is better than last year.
Target achieved All the actions are completed, and items delivered. Performance has reached the target level.
Targed bettered More actions have been completed than planned against the target. Performance is better than target.

Summary of targets

This table shows the agreed target scores for BAA London Stansted in 2006/07:

Issue Target Score
Community investment2 To support the London Stansted Partnership and contribute 50% towards the first year costs of a travelcard for successful candidates coming through the partnership. Target achieved
Local economy2 To have 250 delegates on the Skills Training Programme through the London Stansted Partnership, with at least 40% gaining employment. No progress
Air quality1

To deliver Section 106 commitments for air quality monitoring and modelling, namely to:
Undertake and produce a revised airport emissions inventory for oxides of nitrogen and fine particulate matter.
Undertake and produce predictive dispersion modelling of nitrogen dioxide levels and fine particulate matter levels anticipated in 2010.
Make the final report of the emissions inventory and the dispersion modelling available to Uttlesford District Council (UDC) by 31 December 2006.
Undertake continuous monitoring of oxides of nitrogen and fine particulate matter throughout the year, and provide the results to UDC.

Some progress made
Energy1 CO2 derived from energy use to be less than 45,649 tonnes of CO2 in 2006/07. Target bettered
Noise1 At least 98% of aircraft departures on the 4,000ft vectors routes on track.
At least 99 % of aircraft departures on the 3,000ft vectors routes on track.
At least 95 % of aircraft departures on each Standard Instrument Departure Route on track.
Introduce a new Noise and Track Keeping computer system with searchable online access for public noise enquiries.
Some progress made
Water1 To initiate improvements in water quality monitoring, with installation of new monitoring equipment and to initiate additional water sampling, including a new biological monitoring programme. Target achieved
Waste1 To recycle at least 26% of airport waste between April 2006 and March 2007. No progress
Biodiversity and archaeology1 Identify 0.5 hectares of land that can be enhanced for improved ecological value in line with Stansted’s biodiversity management plan. Target achieved
Surface transport1 To complete the construction of the PTI (bus & coach station) by 31 May 2007. Target achieved
To introduce a real time information system to the PTI by 31 May 2007. Some progress made
Our people2 To carry out diversity awareness training, including Some progress made age discrimination, for at least 85% of BAA staff. Some progress made
Health and safety2 Consolidate effective management leadership at Stansted by conducting thorough reviews of performance and compliance. This will be done via governance meetings that complement the emerging management structure at the airport. An underlying foundation of the governance of health and safety will be effective documentation and communication of relevant processes and policies. Target achieved

1Score assured by ERM
2Score measured by BAA London Stansted