Our performance
Did you know?
Air quality around Stansted is well within the limit set for the protection of human health.
Our performance
This section of the website summarises how we have performed in each of the areas covered by our corporate responsibility report.
Our performance against our 2007 targets is summarised below, with a detailed report on how we have performed in each of those areas available through the menu on the left.
Our performance targets for 2007
Summary of scoring criteria
The table below sets out the agreed criteria for scoring BAA Stansted's progress against its targets for 2007.
| Score | Criteria |
|---|---|
| No progress | The target actions have not been progressed at all, or performance is lower than last year. |
| Some progress made | The target has not been achieved but actions have been carried out towards delivering the target. Performance has not achieved the target but is better than last year. |
| Target achieved | All the actions are completed, and items delivered. Performance has reached the target level. |
| Target bettered | More actions have been completed than planned against the target. Performance is better than the target. |
Our targets for 2007
| Category | 2007 Target | 2007 Target Performance |
|---|---|---|
| Community investment | To have submitted outline planning permission for the Stansted Airport Visitors Centre by the end of December 2007. | Target achieved2 |
| Noise | Prepare a draft noise action plan for Stansted and develop a plan for consultation with key stakeholders by 31 December 2007. This will enable us to agree an action plan with key stakeholders by 30 April 2008. | Target achieved1 |
| Air quality | To develop and publish a Local Air Quality Strategy for Stansted by 31 December 2007. | Some progress made1 |
| Climate change and energy | To improve energy efficiency and reduce carbon dioxide (CO2) created as a result of the airport’s energy use. Specifically for CO2 derived from energy use to be less than 44,469 tonnes in 2007. | Target bettered1 |
| Waste | To recycle at least 30% of airport waste between April 2007 and December 2007. | No progress1 |
| Water | At least 95% of our discharges to meet Environment Agency standards for the quality of our surface water discharges. | Target achieved1 |
| Water | To improve the monitoring and control of our surface water drainage system through the installation of additional water quality monitors and a telemetry system. | Target achieved1 |
| Security | To manage the security operation to ensure the highest standards of security compliance, while delivering a target of no more than a ten-minute queue time for 95% of our passengers departing in our peaks. | Target achieved2 |
| Transport to our airport | To achieve a 37% share of air passengers using public transport by 2010 and 40% beyond. | Target achieved2 |
| Transport to our airport | To reduce the number of staff driving to and from the airport by private car to no more than 80% by 2010. | Target achieved2 |
| Our people | To further reduce our level of absenteeism by 15% or more. | No progress2 |
| Health and safety | Map, review and update health and safety procedures for all key risks. | No progress2 |
1Score assured by ERM
2Score measured by BAA Stansted