Appendix B - Rail 2nd Tunnel & 4th Platform ES
Statement of Case
Published 14 October 2008. Links to supporting documents mentioned in the statement are provided. Please not that these links will take you to external websites. A statement of case by Three Valleys Water is also published.
Planning Policy Guidance 13: Transport Department for Communities and Local Government
Planning Policy Statement 1: Delivering Sustainable Development Department for Communities and Local Government
Delivering a Sustainable Railway Department for Transport
Eastern Regional Planning Assessment for the Railway Department for Transport
Guidance on Transport Assessment Department for Transport
Secretary of State's announcement: 3 March 2008 Department for Transport
Rolling Stock Plan Department for Transport
Towards a Sustainable Transport System Department for Transport
Essex & Southend-On-Sea Structure Plan Essex County Council
East of England Plan Government Office for the East of England
Greater Anglia Route Utilisation Strategy Network Rail
Strategic Business Plan, October 2007 Network Rail
Strategic Business Plan Update, April 2008 Network Rail
Interactive Local Plan Uttlesford District Council
Three Valleys Water - Statement of Case (246KB)
Main text
Main text (3,269KB)
Appendix 2.2 - Simplified Second Tunnel Programme (24KB)
Appendix 2.3 - Proposed Access and Circulation (4,891KB)
Appendix 9.1 - Simplified Construction Progamme with Plant Data for Noise Assessment - Tye Green Portal and Track Works (1,641KB)
Appendix 9.2 - Construction Noise Assessment for Highfields Farm (493KB)
Appendix 10.1 Plate 1 - Landscape Character Photograph (4,436KB)
Appendix 10.1 Plate 2 (5,945KB)
Appendix 10.1 Plate 3 (4,468KB)
Appendix 10.1 Plate 4 (4,666KB)
Appendix 10.1 Plate 5 (4,335KB)
Appendix 10.1 Plate 6 (4,204KB)
Appendix 10.1 Viewpoints 01-02 (4,834KB)
Appendix 10.1 Viewpoints 03-04 (4,969KB)
Appendix 10.1 Viewpoints 05-06 (4,512KB)
Appendix 10.1 Viewpoints 07-08 (4,191KB)
Appendix 10.2 - Visual Impact Assessment Schedule (120KB)
Appendix 11.1 - M11 Junction 8b Layout / Replacement A120 Trinity Junction Road Layout (12,979KB)
Appendix 11.2 - Determining Traffic Associated with Platform Four Construction (367KB)
Appendix 11.3 - Existing Road Layout (2,659KB)
Appendix 11.4 - Personal Injury Accident Data (Sept 04 - August 07) (2,980KB)
Appendix 11.5 - Links Used in Assessment (2,255KB)
Figure 1.1 - Site Location (1,747KB)
Figure 2 - Location Plan (10,158KB)
Figure 2 - Sheet 1 - Works Plan and Sections (402KB)
Figure 2 - Sheet 2 (697KB)
Figure 2 - Sheet 3 (391KB)
Figure 2 - Sheet 4 (403KB)
Figure 2 - Sheet 5 (692KB)
Figure 2 - Sheet 6 (587KB)
Figure 2 - Sheet 7 (352KB)
Figure 2 - Sheet 8 (741KB)
Figure 2 - Sheet 9 (406KB)
Figure 2 - Sheet 10 (405KB)
Figure 2 - Sheet 11 (229KB)
Figure 5.1-5.2 - Sensitive Receptors within Distance Bands of Potential Dust Sources (3,508KB)
Figure 6.1 - Designated and Non-Designated Cultural Heritage Resources (1,242KB)
Figure 6.2 - Essex Historic Landscape Characterisation Data (1,718KB)
Figure 7.1.1a - Plan showing desk study bat and otter records (1,415KB)
Figure 7.1.1b - (1,316KB)
Figure 7.1.1c - (1,887KB)
Figure 7.1.1d - (1,389KB)
Figure 7.1.2 - Plan Showing Desk Study Bird Records (1,644KB)
Figure 7.1.3 - Plan Showing Desk Study Records of Protected or Otherwise Notable Amphibian, Reptile, Vascular Plant, Invertebrate and Mammal (Excluding Bats, Otters and Badgers) Species (1,792KB)
Figure 7.2 - Plan Showing Statutory Designated Sites (1,640KB)
Figure 7.3 - Plan Showing Non-Statutory Designated Sites (2,282KB)
Figure 7.4a - Phase 1 Habitat Survey (705KB)
Figure 7.4b (793KB)
Figure 8.1 - Stansted Rail Plan - Ground Water Vulnerability (12,756KB)
Figure 10.1 - Topography and Drainage (2,269KB)
Figure 10.2 - Landscape Features and Designations (1,970KB)
Figure 10.3 - Landscape/Townscape Character (2,041KB)
Figure 10.4 - Landscape/Townscape Quality (2,029KB)
Figure 10.5 - Visual Impact Drawing - Operational Phase Tye Green Portal (1,832KB)
Figure 10.6a - Visual Impact Drawing - Operational Phase Cooper's End and Airport Station (2,037KB)
Figure 10.6b (1,584KB)
Figure 10.7 - Landscape Proposals - Tye Green Portal (1,269KB)
Figure 10.8 - Landscape Proposals - Cooper's End Portal and Airport Station (2,125KB)
Figure 12.1 - River Quality (5,307KB)
Figure 12.2 - Water Sample Locations (5,295KB)



