Background Existing runway Second runway Future of flying News Support Stansted

Appendix B - Rail 2nd Tunnel & 4th Platform ES

Adobe PDF iconNon-Technical Summary (56KB)

Statement of Case
Published 14 October 2008. Links to supporting documents mentioned in the statement are provided. Please not that these links will take you to external websites. A statement of case by Three Valleys Water is also published.

Adobe PDF iconStatement of Case (1,139KB)

Adobe PDF iconPlanning Policy Guidance 13: Transport Department for Communities and Local Government
Adobe PDF iconPlanning Policy Statement 1: Delivering Sustainable Development Department for Communities and Local Government
Adobe PDF iconDelivering a Sustainable Railway Department for Transport
Adobe PDF iconEastern Regional Planning Assessment for the Railway Department for Transport
Adobe PDF iconGuidance on Transport Assessment Department for Transport
Secretary of State's announcement: 3 March 2008 Department for Transport
Adobe PDF iconRolling Stock Plan Department for Transport
Adobe PDF iconTowards a Sustainable Transport System Department for Transport
Adobe PDF iconEssex & Southend-On-Sea Structure Plan Essex County Council
Adobe PDF iconEast of England Plan Government Office for the East of England
Adobe PDF iconGreater Anglia Route Utilisation Strategy Network Rail
Adobe PDF iconStrategic Business Plan, October 2007 Network Rail
Adobe PDF iconStrategic Business Plan Update, April 2008 Network Rail
Adobe PDF iconInteractive Local Plan Uttlesford District Council

Adobe PDF iconThree Valleys Water - Statement of Case (246KB)

Main text
Adobe PDF iconMain text (3,269KB)

Adobe PDF iconAppendix 2.2 - Simplified Second Tunnel Programme (24KB)
Adobe PDF iconAppendix 2.3 - Proposed Access and Circulation (4,891KB)
Adobe PDF iconAppendix 9.1 - Simplified Construction Progamme with Plant Data for Noise Assessment - Tye Green Portal and Track Works (1,641KB)
Adobe PDF iconAppendix 9.2 - Construction Noise Assessment for Highfields Farm (493KB)
Adobe PDF iconAppendix 10.1 Plate 1 - Landscape Character Photograph (4,436KB)
Adobe PDF iconAppendix 10.1 Plate 2 (5,945KB)
Adobe PDF iconAppendix 10.1 Plate 3 (4,468KB)
Adobe PDF iconAppendix 10.1 Plate 4 (4,666KB)
Adobe PDF iconAppendix 10.1 Plate 5 (4,335KB)
Adobe PDF iconAppendix 10.1 Plate 6 (4,204KB)
Adobe PDF iconAppendix 10.1 Viewpoints 01-02 (4,834KB)
Adobe PDF iconAppendix 10.1 Viewpoints 03-04 (4,969KB)
Adobe PDF iconAppendix 10.1 Viewpoints 05-06 (4,512KB)
Adobe PDF iconAppendix 10.1 Viewpoints 07-08 (4,191KB)
Adobe PDF iconAppendix 10.2 - Visual Impact Assessment Schedule (120KB)
Adobe PDF iconAppendix 11.1 - M11 Junction 8b Layout / Replacement A120 Trinity Junction Road Layout (12,979KB)
Adobe PDF iconAppendix 11.2 - Determining Traffic Associated with Platform Four Construction (367KB)
Adobe PDF iconAppendix 11.3 - Existing Road Layout (2,659KB)
Adobe PDF iconAppendix 11.4 - Personal Injury Accident Data (Sept 04 - August 07) (2,980KB)
Adobe PDF iconAppendix 11.5 - Links Used in Assessment (2,255KB)

Adobe PDF iconFigure 1.1 - Site Location (1,747KB)
Adobe PDF iconFigure 2 - Location Plan (10,158KB)
Adobe PDF iconFigure 2 - Sheet 1 - Works Plan and Sections (402KB)
Adobe PDF iconFigure 2 - Sheet 2 (697KB)
Adobe PDF iconFigure 2 - Sheet 3 (391KB)
Adobe PDF iconFigure 2 - Sheet 4 (403KB)
Adobe PDF iconFigure 2 - Sheet 5 (692KB)
Adobe PDF iconFigure 2 - Sheet 6 (587KB)
Adobe PDF iconFigure 2 - Sheet 7 (352KB)
Adobe PDF iconFigure 2 - Sheet 8 (741KB)
Adobe PDF iconFigure 2 - Sheet 9 (406KB)
Adobe PDF iconFigure 2 - Sheet 10 (405KB)
Adobe PDF iconFigure 2 - Sheet 11 (229KB)
Adobe PDF iconFigure 5.1-5.2 - Sensitive Receptors within Distance Bands of Potential Dust Sources (3,508KB)
Adobe PDF iconFigure 6.1 - Designated and Non-Designated Cultural Heritage Resources (1,242KB)
Adobe PDF iconFigure 6.2 - Essex Historic Landscape Characterisation Data (1,718KB)
Adobe PDF iconFigure 7.1.1a - Plan showing desk study bat and otter records (1,415KB)
Adobe PDF iconFigure 7.1.1b - (1,316KB)
Adobe PDF iconFigure 7.1.1c - (1,887KB)
Adobe PDF iconFigure 7.1.1d - (1,389KB)
Adobe PDF iconFigure 7.1.2 - Plan Showing Desk Study Bird Records (1,644KB)
Adobe PDF iconFigure 7.1.3 - Plan Showing Desk Study Records of Protected or Otherwise Notable Amphibian, Reptile, Vascular Plant, Invertebrate and Mammal (Excluding Bats, Otters and Badgers) Species (1,792KB)
Adobe PDF iconFigure 7.2 - Plan Showing Statutory Designated Sites (1,640KB)
Adobe PDF iconFigure 7.3 - Plan Showing Non-Statutory Designated Sites (2,282KB)
Adobe PDF iconFigure 7.4a - Phase 1 Habitat Survey (705KB)
Adobe PDF iconFigure 7.4b (793KB)
Adobe PDF iconFigure 8.1 - Stansted Rail Plan - Ground Water Vulnerability (12,756KB)
Adobe PDF iconFigure 10.1 - Topography and Drainage (2,269KB)
Adobe PDF iconFigure 10.2 - Landscape Features and Designations (1,970KB)
Adobe PDF iconFigure 10.3 - Landscape/Townscape Character (2,041KB)
Adobe PDF iconFigure 10.4 - Landscape/Townscape Quality (2,029KB)
Adobe PDF iconFigure 10.5 - Visual Impact Drawing - Operational Phase Tye Green Portal (1,832KB)
Adobe PDF iconFigure 10.6a - Visual Impact Drawing - Operational Phase Cooper's End and Airport Station (2,037KB)
Adobe PDF iconFigure 10.6b (1,584KB)
Adobe PDF iconFigure 10.7 - Landscape Proposals - Tye Green Portal (1,269KB)
Adobe PDF iconFigure 10.8 - Landscape Proposals - Cooper's End Portal and Airport Station (2,125KB)
Adobe PDF iconFigure 12.1 - River Quality (5,307KB)
Adobe PDF iconFigure 12.2 - Water Sample Locations (5,295KB)

Print this page