Background Existing runway Second runway Future of flying News Support Stansted

Rail Schemes Consultation

Stansted Generation 2 - Rail Schemes Consultation - June 2007The following document was published on 06 June 2007 and contains full information on the Stansted Generation 2 Rail Schemes Consultation which runs until 31 July 2007.

All of the individual maps and plans, taken from the complete document, are also available to download as separate PDFs.

Complete document
Adobe PDF iconRail Schemes Consultation - June 2007 (9,002KB)

Maps and plans

Key diagrams
Adobe PDF iconThe proposed schemes - key diagram (192KB)
Adobe PDF iconTottenham Hale to Waltham Cross - key diagram (208KB)

Southern section additional track
Adobe PDF iconExtended south to Tottenham Hale station - junction south of Ferry Lane (166KB)
Adobe PDF iconExtended south to Tottenham Hale station - works at Tottenham Hale Station (105KB)
Adobe PDF iconExtended south to Tottenham Hale station - works at Northumberland Park (183KB)

Central section additional track
Adobe PDF iconWorks at Angel Road station (173KB)
Adobe PDF iconWorks at Ponder End station (165KB)
Adobe PDF iconReplacement footbridge between Scotland Green Road North and Duck Lees Lane (152KB)
Adobe PDF iconWorks at Brimsdown station and level crossing (170KB)
Adobe PDF iconReplacement footbridge and rail overbridge at Turkey Brook (128KB)
Adobe PDF iconWorks at Enfield Lock station, level crossing and junction (188KB)

Northern section additional track
Adobe PDF iconExtended north to Waltham Cross station (175KB)

Stansted Mountfitchet station
Adobe PDF iconStansted Mountfitchet station platform enclosure (254KB)

Stansted Airport works
Adobe PDF iconStansted Airport second rail tunnel (244KB)
Adobe PDF iconStansted Airport station additional platform (217KB)

Print this page